About Firm Construction

This author has not yet filled in any details.
So far Firm Construction has created 27 blog entries.

Broome North Primary School

By |2020-04-06T11:24:55+08:00January 16th, 2020|Education|

Contract value: $14.6M | Location: Broome, WAFIRM Construction was engaged to carry out the full new build construction and fit-out of the entire primary school on a regional greenfield site. The project included 8 classroom teaching/learning blocks, administration building, under cover assembly building, library, oval, playing courts, and extensive landscaping. 

City Beach Residential College

By |2022-02-09T10:49:48+08:00January 15th, 2020|Education|

PROJECTS | EDUCATION The new two-storey administration and services building required the construction of 5m high retaining walls with deep excavation for the footings. Other construction challenges were the safe management of crane movement within an occupied school environment, working at heights, and the management of customised fit-outs and finishes such as curved, acoustic meeting

Forrest St, Cottesloe – Offices and Apartments

By |2020-04-06T16:24:16+08:00January 15th, 2020|Commercial|

Contract value: $9.0M | Location: Cottesloe ,WALocated in the famous suburb of Cottesloe WA, the Forrest St Offices and Apartments for a winery estate, provides an inviting and immersive luxury experience. This new build included new offices, high end residential multi storey apartments, underground barrel cellar, dining and tasting areas. The project included basement car

Amberton Beach Cafe

By |2022-02-09T10:35:48+08:00January 15th, 2020|Commercial|

PROJECTS | COMMERICAL Catering up to 200 people, the Amberton Beach Cafe  offers a beach side internal and external dining experience whilst opening a direct beach access point from Cinnabar Drive.It includes play ground, public amenities, commercial kitchen, outdoor deck and secure turf area.  Construction challenges included building in an environmentally sensitive area and construction

Chrystal Halliday Aged Care Facility

By |2022-02-09T11:21:42+08:00August 15th, 2019|Aged care, Health|

PROJECTS | AGED CARE & HEALTHCARE​ The Juniper Aged-Care Residence in Karrinyup is a modern building with open spaces to bring the residents and visitors together. The Design was managed by T&Z Architects.Each room is fitted with nurse call systems, NBN connection, and CO2 sensors for safety and comfort. High-quality fixtures and finishes include decorative

Wembley Sports Park Pavilion

By |2022-02-09T10:29:39+08:00April 25th, 2019|Commercial|

PROJECTS | COMMERICAL The building consists of brickwork, cladding, concrete stairs and a large metal roof. Outdoor areas include sports turf, sports equipment, and lighting. External works covered the construction of new carpark and fire truck hardstand.FIRM managed latent ground conditions and the tracking of un-known in-ground services. Value engineering included optimised CFC cladding solutions

Ningaloo Visitor Centre

By |2022-02-10T12:21:51+08:00April 25th, 2019|Commercial|

PROJECTS | COMMERICAL This community and visitor centre includes three buildings, which are connected by covered walkways, and large carpark areas. The buildings feature an art gallery, a large aquarium, community and retail areas, and public exhibition space. Civil works comprised rock pitching and swale drain construction, access road modifications, and installation of water and

Quest Apartments and Hotels, Midland

By |2022-02-09T10:02:05+08:00April 25th, 2019|Commercial|

PROJECTS | COMMERICAL FIRM Construction re-priced the project based on already completed works on site. The Estimating Team worked collaboratively with the client and subcontractors to fit the client’s budget and to avoid any further delays to the construction stages.The project team was able to complete the project within a tight time and budget framework.

Bilya Koort Boodja – Centre for Nyoongar Culture and Environmental Knowledge

By |2022-02-09T10:09:22+08:00April 25th, 2019|Commercial|

PROJECTS | COMMERICAL FIRM Construction managed challenging ground conditions adjacent to the river, requiring the redesign of the building foundations for optimised stabilisation. Value engineering opportunities included the incorporation of a hardwearing polished concrete slab for flooring throughout the buildings. The recycled timber was sourced from Cunderdin.To learn more about the centre, please visit the

Trip Service Facility – Rio Tinto

By |2022-02-09T15:42:03+08:00March 29th, 2019|Mining, Rail|

PROJECTS | RAIL FIRM Construction constructed Rio Tinto's trip facilities including a locomotive warehouse and refuelling facilities (78m long x 17m wide x 8m high); installation of eight diesel fuel tanks; pipe reticulation and bridge; oily water separator and evaporation pond (volume: 4,940kL).  Type: Value: Location: Rail $36.3M Cape Lambert, Pilbara region Working Over Live