May 17, 2016

Guildford Grammar Preparatory School

A state of the art building for students at Guildford Grammar School that represents ‘opportunities for a bright future beyond tomorrow’.

Client: Guildford Grammar School
Contract scope: New build and forward works
Location: Perth metropolitan area (Guildford)
Completion date: 2015

Description: Guildford Grammar School’s new Preparatory School buildings’ state of the art facility built specifically for the students. The project includes the construction of three buildings and double storeys classroom blocks, with an overhead link for easy access; a new administration building; and, a full fit-out commercial kitchen and canteen facilities.

On top of this, FIRM Construction completed a forward work demolition, civil and services packages, as well as full internal fit-out of the new buildings. We delivered an aesthetic friendly fit-out with polished timber cabinetries, high-quality surface finishes and fixtures.

The school was fully operational throughout the project’s lifecycle – additional safety precautionary plan was adopted such as traffic and noise management to ensure the safety of students and staff, and minimising the disturbance during school hours. In result, no lost time in injury was recorded for the entirety of this project.