Bellevue Rail Assembly Facility for the Public Transport Authority

By |2022-02-15T11:36:30+08:00October 1st, 2021|Rail|

PROJECTS | RAIL In February 2020, FIRM Construction commenced with the construction of the PTA Bellevue Rail Assembly Facility in Midlands. The site required some preparation, including the removal of buried items, boiler ash, and ACM, and the management of high groundwater levels. The project team commenced then with the construction of the multi-functional rail

Nowergup Rail Depot Upgrade

By |2022-02-15T11:38:01+08:00September 29th, 2021|Rail|

PROJECTS | RAIL The Nowergup Rail Depot Upgrade included the construction of a new maintenance building to service B-series rail cars with 370m of wired rail track through the new depot. FIRM Construction completed the project in accordance with PTA specifications and contractual requirements, with no unplanned service interruptions to depot operations, and no damages

Trip Service Facility – Rio Tinto

By |2022-02-09T15:42:03+08:00March 29th, 2019|Mining, Rail|

PROJECTS | RAIL FIRM Construction constructed Rio Tinto's trip facilities including a locomotive warehouse and refuelling facilities (78m long x 17m wide x 8m high); installation of eight diesel fuel tanks; pipe reticulation and bridge; oily water separator and evaporation pond (volume: 4,940kL).  Type: Value: Location: Rail $36.3M Cape Lambert, Pilbara region Working Over Live

Flashbutt Welding Facility – Rio Tinto

By |2022-02-09T15:46:55+08:00March 29th, 2019|Mining, Rail|

PROJECTS | RAIL FIRM Construction constructed Rio Tinto's rail infrastructure services in Cape Lambert. This computerised flashbutt welding facility produces Australia's longest rail strings (400m). Once these stock lengths are welded, 28 gantry cranes load them onto specialised rail carriages for distribution throughout Rio Tinto's iron ore rail network.   Type: Value: Location: Rail $44.3M Cape