Trip Service Facility – Rio Tinto

By |2019-03-29T13:37:37+08:00March 29th, 2019|Mining|

Contract value: $36.3M | Location: Cape Lambert, Pilbara region FIRM Construction constructed Rio Tinto's trip facilities including a locomotive warehouse and refuelling facilities (78m long x 17m wide x 8m high) ; installation of eight diesel fuel tanks; pipe reticulation and bridge; oily water separator and evaporation pond (volume: 4,940kL). The project team constructed the

Flashbutt Welding Facility – Rio Tinto

By |2019-03-29T12:13:13+08:00March 29th, 2019|Mining|

Contract value: $44.3M | Location: Cape Lambert, Pilbara region FIRM Construction constructed Rio Tinto's rail infrastructure services in Cape Lambert. This computerised flashbutt welding facility produces Australia's longest rail strings (400m). Once these stock lengths are welded, 28 gantry cranes load them onto specialised rail carriages for distribution throughout Rio Tinto's iron ore rail network. 

Narrogin Cottage Homes

By |2019-03-01T16:56:48+08:00March 1st, 2019|Aged care, Commercial, Health|

Narrogin Cottage Homes provides local residences premier residential aged care facility and alternate community housing providers for seniors. Contract value: $5.8M | Location: Narrogin, South west regionNarrogin Cottage Homes provides an extensive range of care and support to its residents including residential and short-term (respite) care. The additional 35 bed aged care facility which offers permanent

Opal Aged Care Geraldton

By |2019-03-01T16:20:41+08:00March 1st, 2019|Aged care, Health|

Winner of the 2017 Masters Builders Bankwest Building Excellence Awards. Contract value: $8.1M | Location: Geraldton, Mid west region Opal Aged Care (formerly Domain Principal Group) is one of the leading, privately owned aged care providers in Australia. With over 70 homes in four states providing specialist aged care services for a range of needs

Mukinbudin Health Centre

By |2019-02-28T16:35:40+08:00February 28th, 2019|Health|

Contract value: $2.5M | Location: Mukinbudin, North east region Mukinbudin Health Centre is providing the local community with modernised, highly technological health service to support better care closer to home. As part of the Royalties for Region program, the new health centre will dramatically improve medical resources and emergency coverage in the areas. This facility is

Shire of Katanning Administration and Civic Centre

By |2019-02-28T15:31:02+08:00February 28th, 2019|Commercial|

Contract value: $6M | Location: Katanning, South west region The new Shire of Katanning's Administration and Civic Building is a two storey, built for purpose facility with access to the first floor of the Katanning Hotel. Located within the Heritage Precinct, the building features locally sourced materials such as the prominent Narrogin burgundy brick. The

Cunderdin Health Centre

By |2018-12-17T08:42:43+08:00December 17th, 2018|Health, Uncategorized|

As part of the Southern Inland Health Initiative (SIHI), FIRM Construction was appointed as the Head Contractor for this project. The brand new Cunderdin Health Centre will replace the existing Cunderdin Hospital, promising a new era for regional local health care. The project works include initial civil works and construction of a brand new health

10kp Calibre EPCM Site Offices

By |2018-08-16T13:42:48+08:00August 16th, 2018|Mining|

Contract value: $3.5M | Location: Cape Lambert, Pilbara FIRM Construction was engaged to deliver Calibre's transportable site offices in Cape Lambert, Western Australia. Contracted under a design and construct contract, the team lead the transportation of the pre-fabricated offices from Perth to Cape Lambert. In addition, the team conducted site preparation works, and installation and

Operations and vehicles inspection facilities

By |2018-08-16T13:43:36+08:00August 16th, 2018|Mining|

Contract value: $10M | Location: Cape Lambert, Pilbara FIRM Construction was engaged on a design and construct contract by Rio Tinto to build its Cape Lambert's operations and vehicles inspection facility. The project includes the construction of 1,000m2 of office space, 200m2 vehicle inspection shed, camp accommodation with transportation logistics, site preparation and services.  In addition,